singapour-toit-desktop

Singapore stadium
Moving tiers mechanization

Designed by DEP Engineering

General design of the handling system. Customer : Dragages Singapour, a subsidiary of Bouygues Construction.

Singapore's National Stadium is a multi-purpose stadium whose main feature is its modularity, with a retractable roof and, above all, removable stands for soccer, rugby, cricket and athletics matches.

Basic design

Detailed design

Calculation note

Production supervision

Operation (assistance)

DEP was responsible for the overall design of the mechanization systems.

The moving tiers and their mechanism in a few figures:

  • 8 tiers modules, each weighing around 1.250T, moving horizontally (13m stroke).
  • 49 platforms, each weighing 110T, moving vertically (9m stroke).
  • Additional tiers elements (also movable) are positioned on these platforms.

As part of this project, we also worked on the roof of the Singapore stadium.

On video

>
>

See also

Moving roof of the Singapore stadium